For owners of exquisite homes in Toowoomba’s most desirable areas—like East Toowoomba, Rangeville, and the executive estates on the Range—time and quality are your most valuable assets. You are not just buying a new kitchen; you are investing in a lifestyle upgrade.
The most common question we hear is about the timeline. For a full, bespoke luxury kitchen renovation in our region, the physical build typically takes 8 to 14 weeks. However, to understand the true timeline, we must examine the entire journey, which starts long before the first wall is knocked down.

The Pre-Game: Planning is Everything (2–8 Weeks Minimum)
A fast build relies on flawless planning. The longest part of any high-end kitchen isn’t the demolition; it’s the detailed pre-construction phase, which usually requires two to eight weeks or more to complete properly. Rushing this stage is the number one cause of budget overruns and construction delays.
Design and Documentation
This is where your vision becomes a practical reality. We allocate time for initial consultations, concept development, and finalising the working drawings. For a luxury space, this includes detailed structural, electrical, and plumbing plans that account for large, high-power appliances and complex lighting schemes. This level of detail is essential for avoiding costly surprises later.
Material Selections and Bespoke Finishes
This is where you choose your finishes: the timber for your custom cabinetry, the specific slab of natural stone for your benchtops, and the designer tapware. For high-end homes, these aren’t stock items. They are often custom-made or imported.
Securing Critical Lead Times
This is the most time-sensitive element. Top-of-the-line appliances (like integrated induction cooktops or wine fridges) and premium materials often have significant lead times, sometimes six to twelve weeks. By starting to plan now, we secure your items and confirm delivery slots well in advance. This means your new cabinetry doesn’t arrive only to sit idle while waiting for the right benchtop slab.
The Construction Phase: Hands-On Work (6–9 Weeks)
Once your materials are on order, the physical work can begin. A professional builder manages this stage like a tight sequence of dominoes.
Demolition and Site Preparation (1–2 Days)
This is the fastest part. We safely dismantle and remove your old kitchen. For luxury renovations, meticulous site protection is crucial, ensuring no damage to surrounding flooring or finishes in the rest of your home.
Rough-In Services (3–5 Days)
The plumber and electrician move in next. They install the new pipes and wiring behind the walls to perfectly match the plans for your new layout. Since luxury appliances demand higher power loads, this often involves upgraded circuits, making the process highly technical.
Carpentry and Cabinetry Installation (3–7 Days)
Your custom-built cabinetry is installed. This is a moment of truth, confirming the fit and finish. Any error here—such as a dimension being off by even a single millimetre—would halt the project completely while a new piece is remanufactured.
Benchtop Templating (1 Day, Followed by Waiting)
The carpenter’s work must be 100% complete before this step. A specialist uses laser measuring tools to create a template of the installed cabinets. This ensures your expensive stone or engineered benchtop fits perfectly without gaps.
Benchtop Fabrication and Installation (1–3 Weeks Wait)
This is a major waiting period. After templating, your specific slab is cut, polished, and prepared for installation. Due to the complexity of cutting natural stone and the demand for skilled stonemasons, this stage often dictates the schedule, adding one to three weeks before installation can happen.
Tiling, Splashbacks, and Flooring (3–5 Days)
We install any new flooring, wall tiles, and your splashback. This includes the necessary curing time for grout and adhesives, which cannot be rushed to achieve a perfect, durable finish.
Final Fit-Off (1 Week)
In the final week, the electricians return to install light fixtures and switches, and the plumbers fit the taps and sinks. All appliances are installed, connected, and tested. This meticulous process ensures everything is perfect, down to the final handle alignment, before handover.
Unexpected Delays That Can Impact Your Timeline
Even the most thorough planning can’t prevent every external risk. By acknowledging these potential “gotchas,” we demonstrate a transparent and professional approach to project management.
The ‘Asbestos Surprise’
Many older, quality homes in the Toowoomba area, particularly those built before 1990, may contain materials with asbestos hidden behind walls or splashbacks. If found during demolition, work must stop immediately. A licensed removalist must be called in for safe and legal removal, a non-negotiable step that can add three to seven days to your schedule.
Hidden Plumbing and Electrical Faults
Demolition often reveals a historical tangle of outdated services that aren’t up to current Australian codes. If your plumber or electrician finds rusted pipes, old fuse boxes, or dangerously shoddy DIY wiring, they cannot safely install the new services until these legacy faults are corrected. This necessary corrective work often requires permits and can add three to five days of unplanned labour.
Structural Surprises
This is common in homes that have undergone modifications over decades. If a wall is removed and it is found to have load-bearing capacity without adequate internal support, an engineer must be called immediately. Designing, fabricating, and installing a new structural beam (or ‘lintel’) is required for safety and compliance; easily add one to two weeks to the project.
Backordered or Damaged Custom Goods
You’ve planned perfectly, but shipping risks remain. If a premium imported stone slab arrives cracked, or a bespoke cabinetry panel is damaged during transport, your project will be on hold. Even with the best local suppliers, waiting for a replacement and custom fabrication can mean a delay of one to four weeks.
Why Choosing a Local Toowoomba Builder is Non-Negotiable 🇦🇺
For a significant investment, the biggest guarantor of a reliable timeline and superior quality is a local expert such as Sir Lancelot’s Kitchens (SLK).
Expertise in Local Codes and Climate
A local Toowoomba builder is familiar with the specific building codes and regulations of the Toowoomba Regional Council. This means less time waiting for approvals and less risk of non-compliant work. Furthermore, they know exactly how the local climate—from cool winters to hot, humid summers—affects materials. This knowledge ensures your cabinetry and finishes are durable and guaranteed to last.
Strong, Reliable Supplier Networks
Local builders rely on long-standing relationships with the best tradespeople and regional suppliers. This network enables them to coordinate skilled plumbers, electricians, and stonemasons efficiently, which is crucial to maintaining a tight schedule. It also means that if a rare item needs to be replaced, they can source a solution faster than a builder from outside the area.
Accountability and Reputation
A local firm, particularly one with a showroom right here on Mort Street, relies heavily on its community reputation for future work. They are members of Master Builders Queensland, committed to quality, and deeply invested in your satisfaction. This high level of accountability means you receive prompt, dedicated service and complete peace of mind.
Now’s the Perfect Time to Start Planning Your Dream Kitchen
A high-end kitchen renovation is a major project. To ensure a seamless and efficient experience, you must start planning today.
By getting ahead of the curve, you lock in the lengthy lead times for your custom materials and, crucially, secure the best local tradies before their calendars fill up for the year. Don’t wait for the inevitable peak rush.
Contact us today to begin the design process and ensure your exquisite new Toowoomba kitchen is completed exactly when you need it.
Search for blog post
Our latest blogs
Protected: The Anatomy of a Bespoke Renovation: A 12-Week Timeline
Password Protected
To view this protected post, enter the password below:
Understanding the Cost of a Luxury Kitchen Renovation in Toowoomba
For discerning homeowners with a portfolio of properties, a kitchen is more than just a place to cook. It's the heart of the home—a space for connection, creativity, and elegance. When you're considering a renovation, the question isn't just "how much will it cost?"...
Why Buy Australian When It Comes to Your Kitchen
We can all make a positive impact by buying Australian Made. In these uncertain times it is even more important to unite and together champion all things that are great about Australia. Choosing an Australian made kitchen manufactured in Australia from Australian...
How to Choose the Right Kitchen Company For Your New Kitchen
When renovating a kitchen there are many things to consider - the design, how it is constructed and manufactured and how the kitchen is installed are all important. For such a big investment it is important to understand that not all kitchen companies work the same....
The Butler Sink is Making a Comeback
The popularity of open-concept designs in modern homes has caused many to look into the timeless elegance and functionality of a Butler Sink. Together with the latest Shaker Style Kitchen, a Butler Sink is a popular choice. Why is this so? How will you know if adding...
The Shift to Working in Zones rather than within a Triangle
The National Kitchen and Bath Association (NKBA) refer to the Kitchen Work Triangle Design Rule. This principle was established in the 1940s. Does this still apply today? Working within the triangle zone may have been the trend in the 1940s because of the...
Factors To Consider When Choosing Door Style Kitchen for Your Kitchen
There are differences in the door styles available that you need to consider before making a decision about which door option is right for you. Laminate doors (Laminex, Polytec, Borg): Durable Easy to clean Low maintenance Affordable with budget options...
How to Choose the Best Door Style for Your Kitchen, Bathroom or Laundry?
There are differences in the door styles available that you need to consider before making a decision about which door option is right for you. Laminate doors (Laminex, Polytec, Borg): Durable Easy to clean Low maintenance Affordable with budget options...